<rt id="bb05v"></rt>
      <span id="bb05v"><optgroup id="bb05v"></optgroup></span>

      <label id="bb05v"><meter id="bb05v"></meter></label>
    1. <span id="bb05v"></span>

        <li id="bb05v"></li>

        Welcome to Suzhou Xinrongfa Metal Products Co., Ltd.
        CN EN

        Adhering to quality is the life of an enterprise

        Coating spraying of Teflon, tungsten carbide and alumina

        Service hotline:

        15995489385

        + Wechat number:wechat number

        Your location: Home > Information dynamics > Industry dynamics

        Recommended products

        National Service Hotline

        15995489385

        Introduce the nine operating steps of ptfe lining

        Source:en      Release date: 2022年05月20日
        Information summary:With the continuous improvement of high temperature resistance and corrosion resistance requirements of materials, ptfe lining has gradually entered people's field of vision.
        With the continuous improvement of the requirements for high temperature resistance and corrosion resistance of materials, ptfe lining has gradually entered people's field of vision. Relying on its good physical properties, it has been affirmed by many customers, but the specific steps for this type of spraying What is it like? I think many people don't know much about it and are very interested in it. To this end, I will introduce the nine steps of ptfe lining: Step 1: Check     whether there are pores, deformations, gaps and other poor welding conditions on the
             surface of the sprayed material .      Step 2: Preparation     1. Grinding: Use an angle grinder to carefully grind the burrs, welding slag, sharp corners, and sharp corners on the surface of the material.     2. Degreasing: Use 420 ℃ high temperature degreasing for empty burning, set the holding time according to the size and weight of the workpiece, and burn off the residual oil of the material.     3. Surface roughening: sandblasting adopts 5 to 7 kg air pressure, and the surface of 20# gold steel sand is evenly sandblasted.      Step 3: Pre-treatment of ptfe spraying     1. Put the workpiece on the inner shelf of the oven.     2. Use an air gun with a pressure of not less than 5kg to blow off the dust on the sandblasted surface.     3. Before spraying, the material is preheated and dried to remove the residual water on the surface.      Step 4: Preparation before primer spraying     1. Carry out vulcanization treatment 10 minutes ahead of the spray primer.     2. Check whether the powder output, static electricity and air pressure of the electrostatic spray gun are normal. If there are any abnormal problems, they should be solved in time to ensure smooth spraying.     3. Wear protective masks, glasses and dustproof clothing.      Step 5: Primer spraying     1. The material used is ECTFE special primer, and the specific type of primer is selected according to customer requirements.     2. The thickness of the sprayed film is about 0.16 mm, and the baking temperature is 280 °C.
             Step 6: The preparation work before
            coating is similar to primer spraying. Vulcanize the coating material 10 minutes in advance, and check whether the powder output, static electricity and air pressure of the electrostatic spray gun are normal. If there are any abnormal problems, they should be solved in time. Ensure smooth spraying.
             Step 7: Coating operation
            1. The material used is ECTFE type.
            2. The thickness of each spraying film is between 0.15mm-0.25mm.
            3. The sintering temperature is 260°C, and the holding time will vary according to the size and weight of the sprayed material.
            4. Repeat spraying and sintering.
             Step 8: Detect the coating
            1. Use a film thickness gauge to measure the thickness of the ptfe lining to check whether it meets the corresponding standard.
            2. Check the surface for chromatic aberration, sand, sagging, etc.
            3. Laser detection is carried out on the surface of the material through the coating detection technology, and no sparks are generated as the standard.
             Step 9: Pack and transport the materials. Pack the materials
            with bubble wrap and pearl cotton to avoid bumps and damages during transportation.
             The above is a brief introduction to the ptfe lining process. If you want to know more details, welcome to our Suzhou Xinrongfa Metal Products Co., Ltd. for consultation and understanding.
        主站蜘蛛池模板: 欧美精品91欧美日韩操| 91大神精品全国在线观看| 日韩精品成人亚洲专区| 国产欧美亚洲精品A| 欧美成人精品欧美一级乱黄码| 99久久99久久精品国产片果冻| 免费精品99久久国产综合精品| 亚洲精品国产精品乱码不卡| 精品国产AⅤ一区二区三区4区| 99国产精品一区二区| 久草热久草热线频97精品| 亚洲日韩国产AV无码无码精品| 亚洲AV无码乱码精品国产| 九九久久精品国产| 久久丝袜精品中文字幕| 在线精品亚洲一区二区小说| 国产精品v欧美精品v日韩| 国产精品国产三级国产av品爱网| 国产精品亚洲精品日韩已满| 真实国产精品vr专区| 国产精品55夜色66夜色| 久久国产乱子伦免费精品| 欧美精品VIDEOSEX极品| 乱色精品无码一区二区国产盗| 99久久99久久精品国产| 国产精品综合久久第一页| 天天爽夜夜爽8888视频精品| 亚洲国产精品自在在线观看| 精品999在线| 精品99又大又爽又硬少妇毛片| 亚洲国产精品久久| 国产精品丝袜黑色高跟鞋| 精品久久人妻av中文字幕| 欧美精品人爱a欧美精品| 国产精品影音先锋| 91自慰精品亚洲| 亚洲精品无码99在线观看| 亚洲中文字幕久久精品无码APP| 久久精品99久久香蕉国产色戒| 久久精品国产99久久久香蕉| 亚洲国产精品久久久久久|